A thank-you letter from the customer

Recently, Anhui Derun Electric received a letter of thanks from the site of Donghua Science and Technology Yangmei Taihua Gasification Technological Transformation Project, and hereby commended Comrade Pan Hao of the commissioning department of our company. The letter emphasized Comrade Pan Hao's working attitude at the project site, treated the work with a serious and responsible, hard-working state, and assisted the on-site installers to successfully complete the power transmission work.

这里是占位文字

04-18

2023

View More

Qidong Coal Mine Mud Drying General Contracting Project

Anhui Derun Electric successfully undertook a batch of low-voltage distribution cabinets from Huihengyuan Coal Power Co., Ltd. for the general contracting project of Qidong coal mine mud drying design and construction. The commissioning work was completed and put into operation on March 2019, 3.

这里是占位文字

04-18

2023

View More

Baoshan Haichuang Garbage Power Generation Project

Anhui Derun Electric Technology Co., Ltd. undertook a batch of 10KV high-voltage cabinets from Anhui Conch Kawasaki Engineering Co., Ltd., which were applied to the waste power station project and actively promoted the development of green economy. In December 2019, the power transmission work was completed and the power distribution operation was successfully operated.

这里是占位文字

04-18

2023

View More

Emergency Water Supply Project for Diversion of the Yangtze River into Chuzhou

In order to solve the problem of drinking water difficulties for citizens in Chuzhou City, the emergency water replenishment project of "diverting the river into Chuzhou" was urgently launched. Anhui Derun Electric Technology Co., Ltd. provides a batch of 10KV high-voltage cabinets for the power supply of primary and secondary water pump stations. In a production environment with tight schedules and heavy tasks, Derun Electric employees work tirelessly day and night to meet delivery deadlines. After everyone's concerted efforts, the 10KV high-voltage cabinet invested in the project project has been delivered as scheduled.

这里是占位文字

04-18

2023

View More

Operation Report of Shandong Zibo Yellow River Diversion Water Supply Project

Shandong Zibo Yellow Water Supply Project is a key municipal infrastructure construction project in Shandong Province, with a total designed water supply scale of 50×104m3/d, which is constructed in two phases. The first phase is 25,7 tons/day, with a total investment of about 2019 million yuan. In 28, Anhui Derun Electric provided two sets of KYN12-<>G automatic bypass cabinets for the project, which have been running well and easy to operate since they were put into production. The following is the operation report sent by the project manager of Yinhuang Water Supply in Zibo, Shandong.

这里是占位文字

04-18

2023

View More

Aixin (Anqing) Automotive Parts High and Low Voltage Cabinet Project Successfully Runs

Recently, the commissioning department of Derun Electric has sent another operation report, which is from the on-site project department of the first phase of the 1.5 million automatic transmission casing project. At the end of 2019, our company contracted a batch of high and low voltage distribution equipment from Aixin (Anqing) Automotive Parts Co., Ltd. and has been put into operation. Since its operation, the optimized design scheme, advanced production process, and comprehensive after-sales service have received recognition and praise from customers. Derun Electric will continue to focus on quality and safeguard every project with a spirit of excellence.

这里是占位文字

04-18

2023

View More