What should be considered for reducing the capacity of switchgear at an altitude of over 2000 meters

In high mountain areas with an altitude of over 2000 meters, the performance and stability of power equipment will be greatly challenged due to special factors such as thin atmosphere, low temperature, and harsh environment. Among them, the switchgear, as an important component of the power system, has been greatly tested. In high-altitude environments, the failure rate of switchgear is relatively high, and the capacity will also be reduced to a certain extent. Therefore, some measures need to be taken to ensure its normal operation. 1. Characteristics of switch cabinets above an altitude of 2000 meters

这里是占位文字

04-19

2023

View More

Intelligent Selection of Stable Power Control for 10KV Schneider High Voltage Switches

As a key component in electrical equipment, high-voltage switches play a vital role in power systems. Schneider, one of the world's leading manufacturers of electrical equipment, produces 10KV high-voltage switches that are known for their superior performance and reliability. Xiaobian will introduce the characteristics, applications and advantages of 10KV Schneider high-voltage switch.

这里是占位文字

04-19

2023

View More

A thank-you letter from the customer

Recently, Anhui Derun Electric received a letter of thanks from the site of Donghua Science and Technology Yangmei Taihua Gasification Technological Transformation Project, and hereby commended Comrade Pan Hao of the commissioning department of our company. The letter emphasized Comrade Pan Hao's working attitude at the project site, treated the work with a serious and responsible, hard-working state, and assisted the on-site installers to successfully complete the power transmission work.

这里是占位文字

04-18

2023

View More

Qidong Coal Mine Mud Drying General Contracting Project

Anhui Derun Electric successfully undertook a batch of low-voltage distribution cabinets from Huihengyuan Coal Power Co., Ltd. for the general contracting project of Qidong coal mine mud drying design and construction. The commissioning work was completed and put into operation on March 2019, 3.

这里是占位文字

04-18

2023

View More

Baoshan Haichuang Garbage Power Generation Project

Anhui Derun Electric Technology Co., Ltd. undertook a batch of 10KV high-voltage cabinets from Anhui Conch Kawasaki Engineering Co., Ltd., which were applied to the waste power station project and actively promoted the development of green economy. In December 2019, the power transmission work was completed and the power distribution operation was successfully operated.